Introduction
The modular living wall is constructed from high-strength, lightweight structural panels equipped with interlocking fasteners for easy assembly, and incorporates uniquely designed grooves that hold up to nine plants per module.
The integrated geotextile liner ensures optimal soil retention, preventing erosion while providing a stable foundation for root development. All modules should be pre-vegetated in a controlled nursery environment to establish robust root systems prior to site delivery and installation.


Specifications
Vertical Green Wall Module HW-PPC120 Specification
|
Material |
PP |
|
Color |
Black |
|
Size |
500mm L x 500mm W x120mm H |
|
Weight |
2.0kg/unit |
|
Area |
4unit/sqm |
|
Recommended Service Temperature |
-10℃ to 80℃ |
Flower Pot HW:PPH100 Specification
|
Material |
PP |
|
Color |
Black |
|
Size |
100mm L x 100mm W |
|
Weight |
0.063kg/pcs |
|
Area |
9pcs/unit |
|
Recommended Service Temperature |
-10℃ to 80℃ |
Product detail
Applications for modular living wall Include:
- Interior Walls
- Exterior Walls
- Building Facades
- Freestanding Partitions
|
Original |
Jiangsu, China |
|
Certification |
ISO9001. |
|
Price |
Negotiable |
|
Material |
HW-PPC120 |
|
Payment term |
T/T, Western Union, L/C, Paypal |
|
Delivery date |
Negotiable |
|
Packing |
Export standard |
|
Market |
Australia, Southeast Asia, Middle East, India and Pakistan, Europe, South America, etc |
|
Warranty |
1 year |
|
MOQ |
100UNITS |
Features/Equipment characteristics
Engineered for Strength and Ease
High-strength, lightweight construction simplifies handling and installation.
Designed for Accessible Maintenance
Removable modules enable safer and more efficient servicing.
Promotes Root Zone Health
Unique pot design cradles each plant, securing it and encouraging vigorous growth.
Creates a Denser Greenery
Strategically placed side apertures allow for additional plants, achieving fuller coverage.
The installation process for modular living wall is as follows
- Begin with thorough protection of all existing surfaces.
- Install the structural mounting frames.
- Position the irrigation controller and hardscape elements.
- Carefully mount the pre-vegetated panels.
- Integrate the drip irrigation lines and sensors.
- Conduct a full commissioning test of the entire system.
- Conclude with the launch of our ongoing maintenance plan.






