Introduction
Rainwater harvesting tank underground is a heavy-duty plastic module engineered for sub-surface infiltration or onsite storage tank applications.
The modules feature lightweight, high-strength interlocking panels for easy on-site assembly. Units connect vertically and horizontally, ensuring stability in trafficable and high-load areas.




Specifications
|
Model |
HW-PPLB |
Panel |
Cover |
|
Material |
PP |
PP |
PP |
|
Size (mm) |
1000x500x250 |
455x440x30 |
/ |
|
Weight(kg/pcs) |
5.06 |
0.63 |
0.13 |
|
Resistant |
350 |
/ |
/ |
Products Description
Application: Rainwater harvesting tank underground efficiently manages rainwater at its source, capturing runoff from roofs and impermeable surfaces like parking areas, driveways, playgrounds, and sports fields
|
Original |
Jiangsu, China |
|
Certification |
ISO9001. |
|
Price |
Negotiable |
|
Material |
HW-PPLB |
|
Payment term |
T/T, Western Union, L/C, Paypal |
|
Delivery date |
Negotiable |
|
Packing |
export standard |
|
Market |
Australia, Southeast Asia, Middle East, India and Pakistan, Europe, South America, etc |
|
Warranty |
1 year |
|
MOQ |
200UNITS |
Features/Equipment characteristics
Advantages:
- 1. Do not occupy valuable place
- 2. Rainwater treatment system flexibility
- 3. Easy transportation
- 4. Low carbon green,and recycle reuse
- 5. Strong compressive strength
- 6. Long useful life
- 7. Easy installation,shorten the construction period
- 8. Low cost,obvious economical effect
Infiltration System Installation Procedure
Excavate area to design specifications.
Level and compact excavation base.
Lay, level, and compact ≥75mm coarse sand base.
Install ≥200g/m² geotextile over base/walls:
- Maintain ≥200mm overlaps
- Seal joints with PVC adhesive tape
- Ensure surplus geotextile covers tank surfaces post-installation
Position rainwater harvesting tank underground units on geotextile.
Secure units using:
- Stainless steel clips
- Tie wire
- High-strength plastic cable ties
For additional layers:
- Stack or interlock new units onto secured base layer
Create pipe penetrations:
- Install flanged connectors at inlet/outlet positions
- Position outlet below inlet
Cover tanks with geotextile:
- Seal pipe penetrations with PVC adhesive tape
Backfill sides/top with ≥100mm clean coarse sand:
- Compact manually to engineering specs
Apply ≥400mm free-draining soil cover over sand layer per design requirements






